Skip to content

migrate-from-mariadb: mention automatic prefix index (#21584)#21621

Open
ti-chi-bot wants to merge 2 commits intopingcap:release-8.5from
ti-chi-bot:cherry-pick-21584-to-release-8.5
Open

migrate-from-mariadb: mention automatic prefix index (#21584)#21621
ti-chi-bot wants to merge 2 commits intopingcap:release-8.5from
ti-chi-bot:cherry-pick-21584-to-release-8.5

Conversation

@ti-chi-bot
Copy link
Copy Markdown
Member

This is an automated cherry-pick of #21584

First-time contributors' checklist

What is changed, added or deleted? (Required)

Which TiDB version(s) do your changes apply to? (Required)

Tips for choosing the affected version(s):

By default, CHOOSE MASTER ONLY so your changes will be applied to the next TiDB major or minor releases. If your PR involves a product feature behavior change or a compatibility change, CHOOSE THE AFFECTED RELEASE BRANCH(ES) AND MASTER.

For details, see tips for choosing the affected versions.

  • master (the latest development version)
  • v9.0 (TiDB 9.0 versions)
  • v8.5 (TiDB 8.5 versions)
  • v8.1 (TiDB 8.1 versions)
  • v7.5 (TiDB 7.5 versions)
  • v7.1 (TiDB 7.1 versions)
  • v6.5 (TiDB 6.5 versions)
  • v6.1 (TiDB 6.1 versions)
  • v5.4 (TiDB 5.4 versions)

What is the related PR or file link(s)?

Do your changes match any of the following descriptions?

  • Delete files
  • Change aliases
  • Need modification after applied to another branch
  • Might cause conflicts after applied to another branch

github-actions Bot and others added 2 commits May 9, 2026 09:41
Synced from: pingcap/docs#22376
Target PR: pingcap#21584
AI Provider: azure

Co-authored-by: github-actions[bot] <github-actions[bot]@users.noreply.github.com>
@ti-chi-bot ti-chi-bot added lgtm needs-1-more-lgtm Indicates a PR needs 1 more LGTM. size/M Denotes a PR that changes 30-99 lines, ignoring generated files. type/cherry-pick-for-release-8.5 This PR is cherry-picked to release-8.5 from a source PR. labels May 9, 2026
@qiancai
Copy link
Copy Markdown
Collaborator

qiancai commented May 11, 2026

/approve

@ti-chi-bot
Copy link
Copy Markdown

ti-chi-bot Bot commented May 11, 2026

[APPROVALNOTIFIER] This PR is APPROVED

This pull-request has been approved by: qiancai

The full list of commands accepted by this bot can be found here.

The pull request process is described here

Details Needs approval from an approver in each of these files:

Approvers can indicate their approval by writing /approve in a comment
Approvers can cancel approval by writing /approve cancel in a comment

@ti-chi-bot ti-chi-bot Bot added the approved label May 11, 2026
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

approved lgtm needs-1-more-lgtm Indicates a PR needs 1 more LGTM. size/M Denotes a PR that changes 30-99 lines, ignoring generated files. type/cherry-pick-for-release-8.5 This PR is cherry-picked to release-8.5 from a source PR.

Projects

None yet

Development

Successfully merging this pull request may close these issues.

2 participants